Description:
Projects Supported: Small Cell 5G Only Small Cell 4G Only Small Cell 4G & 5G (C-Band or 5GmmWave) ODAS Node IDAS Node Macro New Build (assumes 4G and C-Band) Macro Carrier Add (includes C-Band) Macro RELO Macro Drop & Swap Macro C-Band Prep/Conversion Macro Sector Add Baseband Upgrade The below tasks cover the major projects: Small Cell, IDAS, ODAS 5G Milestone Integration Tasks – Order License Key File (LKF) via IOP – Import LKF to Ericsson Network Manager (ENM) via IOP – Generate SiteInstall file (integration file) via IOP – Install SiteInstall file onto 5G radio – Once integration file reaches 65% install completion, click on the integrate icon – When integration file reaches 100%, the radio is ready to verify connectivity to ENM – Use ENM Scripting Server to verify that the ENM and radio are communicating – Verify node is synchronized – Verify node is on the latest software version, if not upgrade via ENM – Run Post Integration Script via ENM Scripting Server – Run Post Upgrade Script via ENM Scripting Server – Verify PTP timing – Repeat above steps for each 5G radio – Assuming there are no issues, hand over the project to System Performance (SP) to build anchors and run their scripts – SP will hand the project back to NA to finalize the activations process – Test all radio/sectors and do speed and ping tests – Enter testing data into IOP – Complete all IOP Quality Check List Tasks – Activate Call Signs in IOP (FINAL TASK & PAY POINT) Small Cell, IDAS, ODAS 4G Milestone Integration Tasks – Verify power, SFP, and overall Hub readiness to integrate baseband (reference RiPort Map) – Order License Key File (LKF) via IOP – Import LKF to Ericsson Network Manager (ENM) via IOP – Generate SiteInstall file (integration file) via IOP – Install integration file onto baseband – Once integration file reaches 65% install completion, click on the integrate icon – When integration file reaches 100%, the baseband is ready to verify connectivity to ENM – Use ENM Scripting Server to verify that the ENM and baseband are communicating – Verify node is synchronized – Verify node is on the latest software version, if not upgrade via ENM – Run Post Integration Script via ENM Scripting Server – Run Post Upgrade Script via ENM Scripting Server – Run 4X scripts in SAT Tool (if not done via the install files) – Verify PTP timing – Check RSSI on each radio/sector – Verify light levels on fiber – Assuming there are no issues, hand over the project to System Performance (SP) to build Golden Parameters and run their scripts – SP will hand the project back to NA to finalize the activations process – Perform E911 testing – Complete all IOP Quality Check List Tasks – Activate Call Signs in IOP (FINAL TASK & PAY POINT) Macro New Build, RELO and Drop-and-Swap 4G & C-Band Milestone Integration Tasks – Verify power, SFP, and overall Hub readiness to integrate baseband (reference RiPort Map) – Verify fiber path – Integrate IXRe at cell site (work with MSC) – Order License Key File (LKF) via IOP – Import LKF to Ericsson Network Manager (ENM) via IOP – Generate SiteInstall file (integration file) via IOP – Install integration file onto baseband – Once integration file reaches 65% install completion, click on the integrate icon – When integration file reaches 100%, the baseband is ready to verify connectivity to ENM – Use ENM Scripting Server to verify that the ENM and baseband are communicating – Verify node is synchronized – Verify node is on the latest software version, if not upgrade via ENM – Run Post Integration Script via ENM Scripting Server – Build ERAN via feature activation tool for carrier aggregation – Run Post Upgrade Script via ENM Scripting Server – Run 4X scripts in SAT Tool (if not done via the install files) – Verify PTP timing – Build RETs via IOP (scan & troubleshoot with tower crew if not visible in IOP) – Check RSSI on each radio/sector – Verify light levels on fiber – Assuming there are no issues, hand over the project to System Performance (SP) to build Golden Parameters and run their scripts – SP will hand the project back to NA to finalize the activations process – Perform E911 testing – Drive test site and test all sectors, to include speed tests – Complete all IOP Quality Check List Tasks – Punch down environmental alarms – Update FUZE Compliance (hazard materials on site) – Apply stickers and signage – Install and wire up Centeron Fuel Monitor – Activate Call Signs in IOP (FINAL TASK & PAY POINT) Macro Carrier Add C-Band Modification Milestone Integration Tasks – Verify power, SFP, and overall Hub readiness to integrate baseband (reference RiPort Map) – Integrate IXRe at cell site (work with MSC) – Order License Key File (LKF) via IOP – Import LKF to Ericsson Network Manager (ENM) via IOP – Work with tower crew for radio swap out (RUL/RUS to 4449 and/or 8843) – Use scripting tool and SAT Tool to add and delete radios from existing baseband – Generate SiteInstall file (integration file) via IOP – Install integration file onto new baseband (6648) – Once integration file reaches 65% install completion, click on the integrate icon – When integration file reaches 100%, the baseband is ready to verify connectivity to ENM – Use ENM Scripting Server to verify that the ENM and baseband are communicating – Verify node is synchronized – Verify node is on the latest software version, if not upgrade via ENM – Run Post Integration Script via ENM Scripting Server – Build ERAN via feature activation tool for carrier aggregation – Run Post Upgrade Script via ENM Scripting Server – Run 4X scripts in SAT Tool (if not done via the install files) – Verify PTP timing – Build RETs via IOP (scan & troubleshoot with tower crew if not visible in IOP) – Check RSSI on each radio/sector – Verify light levels on fiber – Assuming there are no issues, hand over the project to System Performance (SP) to build Golden Parameters and run their scripts – SP will hand the project back to NA to finalize the activations process – Drive test site and test all sectors, to include speed tests – Perform E911 test (if required…usually at a 700MHZ only site getting upgraded) – Complete all IOP Quality Check List Tasks – Punch down environmental alarms – Update FUZE Compliance (if any new hazard materials were added to site) – Apply stickers and signage (for new cabinets) – Activate Call Signs in IOP (FINAL TASK & PAY POINT)
Skills:
Cell site, Troubleshooting, Fiber optic
Top Skills Details:
Cell site,Troubleshooting,Fiber optic
Additional Skills & Qualifications:
This info covers the high-level scope for the NA SOW tech positions. Pay points will be call sign activation for each project. NA will train and use the SOW techs to augment their current teams. NA will manage the capital project support, and each SOW tech will complete a minimum of 7 capital projects a month for 84 projects per year. The SOW personnel will support Capital projects only, and cannot be used for break/fix, RMA, Network Coordinator, On-Call, or other Expense related tasks. NA will provide tools and test equipment, and request system accesses for SOW personnel. NA will provide test phones and air card/mifi devices. If additional tools and test equipment are needed, NA will provide the costs, and Engineering will find the funds to purchase. SOW Tech is responsible for transportation (to be worked out with SOW company). Engineering and NA will provide EDN Laptops and non-EDN laptops (dumb terminals). Engineering will support milestone billing, funding requests, and POs.
Experience Level:
Intermediate Level
We’re partners in transformation. We help clients activate ideas and solutions to take advantage of a new world of opportunity. We are a team of 80,000 strong, working with over 6,000 clients, including 80% of the Fortune 500, across North America, Europe and Asia. As an industry leader in Full-Stack Technology Services, Talent Services, and real-world application, we work with progressive leaders to drive change. That’s the power of true partnership. TEKsystems is an Allegis Group company.
The company is an equal opportunity employer and will consider all applications without regards to race, sex, age, color, religion, national origin, veteran status, disability, sexual orientation, gender identity, genetic information or any characteristic protected by law.
. In this role as React Developer, you should be passionate about developing solutions to achieve business needs and will...
Apply For This JobJob Description As a Principal UX Product Designer at HP you will be responsible for the creation, development and refinement...
Apply For This JobDescription About LumenLumen is guided by our belief that humanity is at its best when technology advances the way we...
Apply For This JobJob Description SUMMARY The Design Department Manager leads the internal creative agency of the company. In this role, you will...
Apply For This JobDescription * This is remote position, but the employee must be able to travel to the office in San Juan,...
Apply For This JobThis is a US-based Remote position but we prefer candidates based on the East Coast of the United States. *WHO...
Apply For This Job